Case Studies
We have provided DSEAR risk assessments to hundreds of businesses within all industries throughout the UK. Below and on further pages you can view 160+ case studies selected from our work. You may also prefer to click on the Sectors on the right to see case studies related to your industry.
If you have any questions at all about how we can help you with your DSEAR requirements then please do contact us – we’ll be happy to advise you without obligation.
The challenge
Royal Holloway University of London campus at Egham, Surrey incorporates a range of science based courses; these include Bio Science, Geo Science, Physics and Earth Sciences. All are based on the main campus at Egham Hill. Typically the activities involve a range of flammable substances and in some instances…
View Case Study »The challenge
CCL identified the requirement to undertake a DSEAR assessment of both its Norfolk and Castleford sites. The business uses various flammable substances in its processing of quality shrink sleeve products; these include inks, solvents and washes.
DSEAR defines more specific requirements that relate to the risk of fire, explosion and…
View Case Study »The challenge
Norse Environmental Waste Services operate from purpose-built facilities at Dereham Road, Costessey Resource Recovery Park, Norwich. The site processes commercial and residential waste and which incorporates large-scale recycling of dry newsprint and paper products.
Site technology allows for handling and segregation of metal components during recycling operations though involves some…
View Case Study »The challenge
A visit was made to the BWOC forecourt site at Brent Knoll in Somerset in November 2013, to consider compliance with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR).
The BWOC premises are located adjacent to the main highway with purpose-designed fuel storage and transfer facilities. . The…
View Case Study »The Challenge
A visit was made to Bartholomew’s Limited at Chichester in July 2015 to consider compliance in respect of the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR).
The key risk activities for the site surround the seed processing plant; this plant incorporates systems for handling, cleaning and bagging of a…
View Case Study »