The challenge
Momentive Combined Composite Technologies Ltd based at Concorde Way, Fareham in Hampshire produces specialist components for the aerospace and marine industries. Typically the operations involve the use of GRP and carbon fibre technologies.
A key element relates to findings associated with the impact from flammable substances in areas with an…
View Case Study »The challenge
A visit was made to a new biomass installation at Strathcaro Hospital, Brechin, Angus at the end of October 2014 to consider compliance in respect of the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR). This risk assessment has been requested by Turnbull and Scott due to the potential…
View Case Study »The challenge
A visit was made to the Oxford Instruments Plasma Technology facility in Yatton, December 2013 to consider compliance with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR). More recently a re validation inspection was completed In 2017.
Oxford Instruments Plasma Technology provides a range of high performance, flexible tools…
View Case Study »The challenge
Pall Industrial Hydraulics operates from its facility at Cardrew Industrial Estate, Redruth.
In 2013 they were to move the Aerospace paint spray facility within the existing site. The survey undertaken on the 29th May looked at this planned change and reviewed progress against the 2011 DSEAR survey; additionally there was…
View Case Study »The challenge
An independent survey of the new LPG heating installation associated with the four additional HAS structures at RAF Honington IP31 1EE was undertaken in March 2013 at the request of the project manager of Integral UK ltd. This was to ensure legislative and MOD requirements were being met. The installations…
View Case Study »