Case Studies
We have provided DSEAR risk assessments to hundreds of businesses within all industries throughout the UK. Below and on further pages you can view 160+ case studies selected from our work. You may also prefer to click on the Sectors on the right to see case studies related to your industry.
If you have any questions at all about how we can help you with your DSEAR requirements then please do contact us – we’ll be happy to advise you without obligation.
The Challenge
A visit was made to the Kaman Composites site, Darwen, in December 2018 to consider compliance with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR), incorporating Amendment 1: June 2015. At the site, Kaman produces composite components for the aerospace industry. As part of this the processing operations…
View Case Study »The Challenge
In 2022 Imtech Engineering Services Ltd requested an assessment for a boiler plant room refurbishment, at Hastings Conquest Hospital, to consider compliance with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR), incorporating Amendment 1: June 2015.
As part of this we were requested to review controls around flammable…
View Case Study »The challenge
BSI called on our services to review DSEAR compliance at two of their testing laboratory sites during June 2018. This has been followed up with periodic reviews as part of the sites requirements to demonstrate ongoing compliance.
BSI carries out a range of testing and certification services for clients…
View Case Study »The challenge
Walney Island Airfield is located north west of the centre of Barrow-in-Furness, Cumbria, England. The airfield is owned by BAE Systems, who operate private flights for commuting staff to and from other facilities in the United Kingdom.
As part of the airfield upgrade, a request was made to…
View Case Study »The Challenge
A request was made by NVP Energy UK Ltd, to consider compliance with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) for their Anaerobic Digester project at Bairds Malt, Arbroath Facilities. In 2020 the wastewater treatment plant were being upgraded, the new facilities and infrastructure needed to be…
View Case Study »